Owatonna Three Jaw Gear Puller Model #1011 on 2040-parts.com
Oroville, California, US
A three jaw 6" gear puller made in the USA by Owatonna Tool Co of Owatonna Minnesota. Model # 1011. The jaws are different widths at each end and are reversible. While one of the jaws is hidden in the photos, it is a THREE jaw puller. It displays virtually no wear and is in excellent condition. I will ship this DISASSEMBLED!! If you wish to receive it assembled as it is shown in the photos, shipping will be $11.50 rather than $6.00. No returns or refunds. Shipping is within the USA.
Hammers, Pullers, & Extractors for Sale
- Central pneumatic spark cleaner (bi-35)(US $19.99)
- Mac body clamp(US $1.00)
- Drum buster heavy duty brake drum and rotor puller. new(US $37.50)
- Bluepoint 12 oz. ball pien ball peen mechanic hammer(US $9.99)
- Toyota 09308-00010 oil seal puller(US $89.99)
- 14 pcs automotive gear & bearing separator tool kit new automotive precision new(US $39.50)
Mazda3 MPS and i-stop to launch at Geneva
Tue, 03 Feb 2009With a new model of the Mazda3 released at Bologna, Mazda has now added more to the range with the announcement that the Mazda3 MPS and i-stop will be launched at Geneva in March. The Mazda3 MPS is the ‘Hot Hatch’ version of the Mazda3. Aggressive styling, including a big air scoop at the front, new grill trim and front fogs, a big spoiler at the back and twin exhausts, leave you in no doubt that the MPS means business.
McLaren MP4-12C software fixes done – deliveries re-start
Wed, 09 Nov 2011McLaren MP4-12C - back on track The birth of the McLaren MP4-12 C should have been a cause for real celebration; the first new McLaren in a generation (almost) and a Brit competitor for the Ferrari 458. But there have been problems. Like all small car makers, McLaren has to buy-in most of the clever computer whiz-bang stuff all new cars have, which means McLaren’s tech-bods have to work out how to make it all play pretty together.
Hyundai to expand U.S. engine production
Tue, 17 May 2011Hyundai Motor Co. will spend $173 million to expand its engine plant in Alabama to build more four-cylinder engines. The expansion work is set to be complete this fall and production is set to begin in March 2012.