Find or Sell any Parts for Your Vehicle in USA

Motion Pro Throttle Cable Pull Fits Honda 750 Hondamatic Cb750a 1976 on 2040-parts.com

US $23.09
Location:

Grand Rapids, Michigan, US

Grand Rapids, Michigan, US
Returns Accepted:Returns Accepted Refund will be given as:Money back or exchange (buyer's choice) Item must be returned within:14 Days Return policy details:http://stores.ebay.com/Motorcycle-Parts-Giant/Exchange-and-Return-Policy.html Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:Motion Pro Manufacturer Part Number:02-0155

Audi S3 (2006): first official pictures

Tue, 01 Aug 2006

By Phil McNamara First Official Pictures 01 August 2006 06:23 The lowdown Here's the new benchmark for hot hatch acceleration: the 261bhp Audi S3 quattro. Up there with the most powerful hot hatches – the 261bhp BMW 130i and Volkswagen's 250bhp Golf R32 – the S3 is due in the UK in January 2007. Audi claims it despatches the 0-62mph sprint in an impressive 5.7sec.

Autoweek in review: C7 Corvette partly leaks, Edsel's secret shopper, Dax Shepard visits

Fri, 13 Jul 2012

Omega manufacturing made a public name for itself this week as the supplier inadvertently revealed the front nose of the new Corvette C7 in every detail imaginable. A big whoops for the supplier and a speculator's dream come true before the C7 reveal at the Detroit auto show in January. Edsel Ford II had a secret shopper as Autoweek senior online editor Rory Carroll went to the RM Dingman Collection auction on assignment.

Ford begins Daventry site transformation

Mon, 12 May 2014

FORD IS to invest millions of pounds in a new, state-of-the-art training facility on its existing site in Daventry, Northamptonshire, as part of a wider forward-looking programme. The new site will merge the capabilities of two existing Ford colleges – the Technical Training Centre located separately at Daventry, and the Henry Ford College in Loughborough, which provides training for technicians, sales staff and management throughout Ford’s national dealer network. Scheduled to open next year, the brand-new centre will replace the existing facilities to become a centre of excellence for training across the country.