4 Pcs/lot Tire Air Valve Caps Wheel Rim Stem Car Truck Bike Blue Bullet on 2040-parts.com
Virginia Beach, Virginia, United States
Valve Stems & Caps for Sale
- 4 pcs/lot tire air valve caps wheel rim stem car truck bike purple bullet(US $4.99)
- Trd logo valve caps auto wheel tire tyre stem air caps for all toyota silver
- 16pcs gold star design novelty car tire valve stems cap wheel air dust caps bike(US $9.99)
- 4x car wheel tire valve stem air cap cover i love ny mark sign + wrench
- 40pcs aluminum mixed color car tire valve stem caps,motorcycle valve stems cap(US $9.49)
- 20pcs brass car tire valve stem caps,chrome hex colorful crystal diamond valve(US $9.79)
Lexus Premium Compact – The Lexus CT?
Mon, 17 Aug 2009Update 12th Feb 2010: Finally we get confirmation that the production name is the Lexus CT 200h. Update 1st September: Lexus has now revealed their Premium Compact as the Lexus LF-Ch. Back in ’05, the rumour was that the compact would be called the Lexus BS.
Lotus Exige GT3 and 2-Eleven
Thu, 08 Mar 2007By Ben Whitworth Motor Shows 08 March 2007 11:49 Not one, but two hardcore Lotuses? Tell me more... Lotus pulled the wraps off two adrenalin-fuelled racers – the racetrack-biased 2-Eleven and the hardcore Exige GT3 (above).
Lamborghini CO2 reduction Press Release
Sun, 07 Jun 2009Lamborghini CO2 Reduction Press Release • The construction of a large photovoltaic plant, combined with an energy-saving project, will achieve a 30% reduction in the factory’s CO2 emissions by 2010 • Modifications to vehicles will result in a 35% reduction in CO2 emissions by 2015 Automobili Lamborghini announces its intention to complete its program of environmental sustainability in record time by presenting new plans which will enable the company: The plans for reducing emissions will thus involve two areas: modifications to the Lamborghini factory in Sant’Agata Bolognese, and development in vehicle design. To redefine its industrial processes in accordance with its policy of environmental sustainability, Lamborghini has just begun a project to complete installation of a large photovoltaic system by the end of 2009. The roof-top plant will produce 1,582 Megawatt hour (MWh) of “green” energy per year, which translates into a 20% reduction in CO2 emissions (-1,067,820 Kg/year) by 2010.