2009 Nissan Maxima Transmission Module 31036 9n00d Etc51-527n A1 8x08 on 2040-parts.com
Hialeah, Florida, United States
2009 NISSAN MAXIMA TRANSMISSION MODULE 31036 9N00D ETC51-527N A1 8X08 CALL US FOR ANY OTHER PARTS 305 640 5275
COMPUTERS SOLD AS IS , THESE ITEMS ARE REMOVED FROM RUNNING VEHICLES HOWEVER WE DO NOT WARRANTY ELECTRICAL PARTS |
Engine Computers for Sale
- 1995 subaru legacy ls wagon, engine computer module, ecm 22611-ab414(US $55.00)
- Aem series 2 ems engine management system 00 01 acura integra 1.8l 30-6050 new(US $1,280.13)
- 1997 98 lincoln mark viii ecu/ecm/pcm control computer 4.6l 4v mlc-221
- 85 86 87 toyota corolla gts ae86 89661-12090 175600-0011 factory ecu 4ag 4age(US $69.00)
- Apexi ecu power fc w/commander skyline gt-r gtr bcnr33 kouki rb26dett jdm f/s(US $968.80)
- Mercedes benz e220 | 2.2 cdi ecu | 2000 | code a6461531279(US $10.00)
Fiat 500C – Elle’s in love
Wed, 15 Jul 2009Elle Macpherson loves the Fiat 500C Convertible - Don't we all?! And today’s news is just another bit of PR frippery, but it gives us another excuse to run a photo of Elle Macpherson so soon after the Elle Macpherson with the new Jaguar XJ from last week. So that’s it really.
Land Rover Freelander 2 Review & Road Test: Freelander 2 SD4 HSE (2011)
Sun, 20 Mar 2011Freelander 2 SD4 Review & Road Test Whatever way you look at it, Land Rover’s current model line-up is a bit of a mess, at least as far as the lower end – Discovery 4 and Freelander 2 – are concerned. But it’s not the sort of mess to be avoided; rather it should be embraced by buyers before Land Rover get round to fixing it. There’s no argument about the Range Rover.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.